Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Make Safe (Floor Covering Removal) SWMS 10581-2

Make Safe (Floor Covering Removal) SWMS 10581-2

Product SKU: 10581
Make Safe (Floor Covering Removal) SWMS 10581-2 Video

Other Details

PDF Download:
make_safe_floor_covering_removal_swms_10__75449_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Make Safe Floor Covering Removal Safe Work Method Statement Scope:

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event. As such, this SWMS may refer to additional high-risk SWMS for further detail. 

This SWMS provides guidance on the removal and disposal of damaged floor timbers, skirting and carpets. 

Job Steps Covered in Make Safe Floor Covering Removal SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival on site
  4. Remove items - i.e. furnishings, debris etc
  5. Carpet / vinyl removal
  6. Timber removal - timber flooring, direct stick and floating
  7. Loading and transporting waste
  8. On completion
  9. Unloading at landfill


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...