Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Make Safe (Sink Hole) SWMS 10580-2

Make Safe (Sink Hole) SWMS 10580-2

Product SKU: 10580
Make Safe (Sink Hole) SWMS 10580-2 Video

Other Details

PDF Download:
make_safe_sink_hole_swms_10__99481_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Make Safe - Sink Hole Safe Work Method Statement Scope:

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event. As such, this SWMS may refer to additional high-risk SWMS for further detail.

This SWMS provides guidance on the installation of a temporary fence barrier around a sink hole on a private property.

Job Steps Covered in Make Safe - Sink Hole SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival on site
  4. Contact with utilities
  5. Unloading & placement temporary base blocks - approx. 2.5m apart
  6. Unloading & placement of fencing panels
  7. Clamp the fencing bracket with battery operated drill
  8. On completion
  9. Temporary fence pickup


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...