Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Man Cage SWMS 10

Man Cage SWMS 10

Product SKU: 10137
Man Cage SWMS 10 Video

Other Details

PDF Download:
Height_Man_Cage_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • SWMS includes a Falls Emergency Rescue Plan
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Man Cage Safe Work Method Statement

This SWMS provides guidance on safe operation when working at height in a Work Box. Work Boxes may also be called Man Baskets or Man Cages.

  • This SWMS does not cover the operation of specific items of plant used to perform lifts such as cranes or fork trucks etc.
  • This SWMS should be used in conjunction with dedicated SWMS that have been developed for these items of plant.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Power Tools SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations of services
    • Involves a risk of a person falling more than 2m, including on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Implement a Falls Emergency Rescue Plan - This tools is included in this SWMS
    • Assess onsite conditions
    • Work area set up
    • Work Box - Pre-start check
    • Lifting Plant - Pre-start check
    • Trial Lift 
    • Work box operation
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...