Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Manual Handling (Building) SWMS 10168-6

Manual Handling (Building) SWMS 10168-6

Product SKU: 10168
Manual Handling (Building) SWMS 10168-6 Video

Other Details

PDF Download:
Manual Handling Building_SWMS_10168-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Manual Handling (Building) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with hazardous manual handling tasks in the building industry. This SWMS also includes a Hazardous Manual Tasks Risk Assessment Form. 

Job Steps Covered in Manual Handling (Building) SWMS: 

(includes potential hazards and control measures)

  1. Conduct a risk assessment identifying potential hazardous manual tasks
  2. Training and Capabilities
  3. Work area set up, placement of equipment and materials & construction installations e.g. plasterboard, painting, concrete etc
  4. Operating non-mobile plant e.g. jackhammers, power tools, powder actuated tools etc.
  5. Operating powered mobile plant
  6. Working near powered mobile plant


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...