Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Materials (Duct) Lifter SWMS 10440-1

Materials (Duct) Lifter SWMS 10440-1

Product SKU: 10440
Materials (Duct) Lifter SWMS 10440-1 Video

Other Details

PDF Download:
Materials (Duct) Lifter SWMS 10440-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Materials (Duct) Lifter Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the use of use of a materials lifter. Included in this SWMS is the planning and preparation, training, site preparation and operational use associated with the task.

Job Steps Covered in Materials (Duct) Lifter SWMSt: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival Onsite
  4. Site Setup
  5. Lifter Operation
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...