Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the use of All Terrain Vehicles (ATV) i.e. quad bikes, gator utilities etc.
Quads bike incidents are one of the leading causes of deaths on Australian properties. Between 2000-2016 there were some 220 deaths reported, with thousands more injured.
Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.
Quad Bike (ATV) SWMS Content:
For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.
Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.