Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Mobile Plant (Glass Handler) SWMS 10601-2

Mobile Plant (Glass Handler) SWMS 10601-2

Product SKU: 10601
Mobile Plant (Glass Handler) SWMS 10601-2 Video

Other Details

PDF Download:
Mobile Plant Glass Handler SWMS_10601-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant (Glass Handler) Safe Work Method Statement Scope:

This SWMS includes information to assist in the identification of effective risk controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a powered mobile glass handler. Glass Handler pre-start checklist included with SWMS.

Job Steps Covered in Mobile Plant (Glass Handler) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Pre-start Check Transport Vehicle & Trailer
  4. Assess Onsite Conditions
  5. Delivery and Removal of Glass Handler
  6. Glass Handler Pre-start Check
  7. Operation
  8. Changing Attachments
  9. Lifting Glass Handler with Crane
  10. Charging Batteries
  11. Maintenance on site
  12. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...