Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Mobile Plant (Heavy Vehicles - Service Maintenance) SWMS 10085-6

Mobile Plant (Heavy Vehicles - Service Maintenance) SWMS 10085-6

Product SKU: 10085
Mobile Plant (Heavy Vehicles - Service Maintenance) SWMS 10085-6 Video

Other Details

PDF Download:
mobile_plant_heavy_vehicle_service-maintenance_swms_10085-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Heavy Vehicles - Service Maintenance Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with aspects of earth moving machinery and equipment maintenance undertaken at other sites –such as a construction site or farm. Earthmoving equipment: any mobile plant / equipment used for undertaking earthmoving activities. (I.e. front-end loaders, excavators, backhoes, dozers, graders, skid-steer loaders and tractors etc.)

Job Steps Covered in Heavy Vehicles - Service Maintenance SWMS:

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to / from site
  4. Assess onsite conditions
  5. Designate a suitable area for maintenance
  6. Servicing plant on site
  7. Pneumatic / powered grease guns
  8. Air Tools
  9. Refuelling
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...