Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Mobile Plant (Low Loader Transport) SWMS 10337-4

Mobile Plant (Low Loader Transport) SWMS 10337-4

Product SKU: 10337
Mobile Plant (Low Loader Transport) SWMS 10337-4 Video

Other Details

PDF Download:
Mobile plant (low loader transport) SWMS 10337-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant (Low Loader Transport)  Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the movement of plant (referred to as the load) using a Low Loader Transport Vehicle. Included in this SWMS are prestart checks, planning and safe operation of the vehicle and winch. This SWMS also includes a Vehicle prestart checklist.

Job Steps Covered in Mobile Plant (Low Loader Transport) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to and between sites transporting the load  
  4. Pick-up/set down of load
  5. Refuelling
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...