Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (Mini Loader) SWMS 10098-5

Mobile Plant (Mini Loader) SWMS 10098-5

Product SKU: 10098
Mobile Plant (Mini Loader) SWMS 10098-5 Video

Other Details

PDF Download:
Mobile Plant (mini loader) SWMS 10098-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • SWMS includes a Plant Roll Over Emergency Response & Pre-Start Checklist
  • You must have Microsoft Word or iAuditor to use this template

Mini Skid Steer Loader Operation Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the operation of a mini loader and attachments. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

 

Mini Skid Steer Loader Operation  SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Pre start check (Transport vehicle & trailer)
    • Arrival onsite
    • Delivery and removal of mobile plant
    • Operation
    • Changing attachments
    • Maintenance on site
    • Refuelling on site
    • On Completion
  • Plant Roll-Over Emergency Response
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  
  • Mini Skid Steer Loader Pre Start Checklist

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...