Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Mobile Plant (Road - Rail Excavator) SWMS 10117-7

Mobile Plant (Road - Rail Excavator) SWMS 10117-7

Product SKU: 10117
Mobile Plant (Road - Rail Excavator) SWMS 10117-7 Video

Other Details

PDF Download:
mobile_plant_road-rail_excavator_swms_10117-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Logo can easily be added
  • Add or Delete information to this template
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant (Road-Rail Excavator) Safe Work Method Statement

This pre-filled Mobile Plant (road-rail excavator) Safe Work Method Statement (SWMS) covers the operation of a road/rail excavator on rail tracks; including track re-construction, turnout construction, turnout re-sleepering, re-sleepering and partial re-sleepering as required. 

Job Steps Covered in Mobile Plant (Road-Rail Excavator) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival onsite
  4. Delivery and removal of mobile plant
  5. Operation
  6. Hoisting loads
  7. Changing buckets or other attachments
  8. Battering /trenching
  9. Refuelling on site
  10. On completion

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...