Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (Semi-truck & Trailer) SWMS 10432-1

Mobile Plant (Semi-truck & Trailer) SWMS 10432-1

Product SKU: 10432
Mobile Plant (Semi-truck & Trailer) SWMS 10432-1 Video

Other Details

PDF Download:
Mobile Plant Semi-truck Trailer SWMS_10432-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant (Semi-truck & Trailer) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the operation of Semi-truck and trailer. Included in this SWMS is the use of the truck, including prestart and operational use, traffic and pedestrian control, loading and unloading. Mobile Plant prestart checklist included with SWMS.

Job Steps Covered in Mobile Plant (Semi-truck & Trailer) SWMS: 

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Pre-start Check
  4. Coupling/Uncoupling Trailers
  5. Travel To/From/Between Sites
  6. Arrival at Site
  7. Loading/Unloading
  8. Refueling
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...