Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Mobile Plant (Street Sweeper) SWMS 10260-4

Mobile Plant (Street Sweeper) SWMS 10260-4

Product SKU: 10260
Mobile Plant (Street Sweeper) SWMS 10260-4 Video

Other Details

PDF Download:
mobile_plant_street_sweeper_swms_10260-4__12038_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Street Sweeper Safe Work Method Statement Scope:

This SWMS covers mechanically powered, regenerative air street sweepers. Included in this SWMS is planning and preparation, training requirements, operational controls including accessing standpipes, and maintenance. This SWMS includes a Street Sweeper Truck Pre-start checklist.

Job Steps Covered in Street Sweeper SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess conditions for operation
  4. Street sweeper operation
  5. Obtaining water from hydrant or another water source e.g. creek/dam
  6. Maintenance
  7. Refuelling
  8. On completion / empty hopper / cleaning


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...