Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the operation of slewing and non-slewing Telescopic handlers. This SWMS includes planning and preparation, training requirements, pre-start, operation and maintenance activities. A mobile Telehandler Pre-Start Checklist - Road Travel is included in this SWMS.
(includes potential hazards and control measures)