Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (Tilt Tray Transport) SWMS 10268-3

Mobile Plant (Tilt Tray Transport) SWMS 10268-3

Product SKU: 10268
Mobile Plant (Tilt Tray Transport) SWMS 10268-3 Video

Other Details

PDF Download:
Mobile Plant Tilt Tray Transport SWMS_10268-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant Tilt Tray Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers general hazards associated with the movement of plant and structures such as portable buildings or shipping containers (referred to as the load) using a Tilt Tray Transport Vehicle. Included in this SWMS are prestart checks, planning and safe operation of the vehicle and winch. This SWMS also includes a Vehicle prestart checklist.

Job Steps Covered in Mobile Plant Tilt Tray SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to Pick-up and Transporting the Load
  4. Pick-up of Load
  5. Set-down of Load
  6. Refuelling
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...