Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (tipper + dog) SWMS 10271-7

Mobile Plant (tipper + dog) SWMS 10271-7

Product SKU: 10271
Mobile Plant (tipper + dog) SWMS 10271-7 Video

Other Details

PDF Download:
MobilePlant_tipper_dog_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template (iAuditor version coming soon)

Mobile Plant (tipper + dog) SWMS 10271-7

This Safe Work Method Statement (SWMS) is a comprehensive document covering general hazards associated with the operation of a Tip Truck, including side tippers. This SWMS also includes the coupling and use of trailers.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

 

Mobile Plant (tipper + dog) SWMS 10271-7 Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Pre start check - Pre start checklist contained in this SWMS
    • Worker consultation
    • Entering or exiting cabin
    • Operation
    • Loading / Unloading
    • Coupling / Uncoupling Trailers
    • When working outside of truck/cabin
    • Maintenance on site
    • Refuelling
    • On completion
    • Avoiding truck roll-over
    • Plant Roll-Over Emergency Response
    • Mobile Plant Pre Start Checklist
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Great document. Easy to follow and complete.

    Posted by on

    Document is very comprehensive, easy to read and easy to complete. I did have a question regarding one aspect and when I phoned Safety Culture for help, they were very helpful.


  2. SWMS Tip Truck

    Posted by on

    Comprehensive document - saves time by providing all the references required. Very user-friendly.


$79.95

PLUS GST

View Cart


You May Also Need...