Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (Vacuum Service Truck) SWMS 10259-4

Mobile Plant (Vacuum Service Truck) SWMS 10259-4

Product SKU: 10259
Mobile Plant (Vacuum Service Truck) SWMS 10259-4 Video

Other Details

PDF Download:
Mobile Plant (vacuum service truck) SWMS 10259-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant Vacuum Service Truck Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) provides an outlines of the job steps, generic hazard and controls associated with the operation for truck mounted vacuum services for industrial waste and liquid removal. This includes removal of liquid waste from septic tanks, storm water drains, industrial slurries or other forms of liquid waste. Included in this SWMS is the use of the truck, including prestart and operational use, traffic and pedestrian control, use of pressurised vacuum equipment and waste disposal.

Job Steps Covered in Mobile Plant Vacuum Service Truck SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Truck operation (travel to/from/ between sites)
  4. Arrival onsite
  5. Manhole/pit safety
  6. Pumps
  7. Vacuum operation
  8. Unloading/emptying truck
  9. Refueling
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...