Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Mobile Plant (Water Cart) SWMS 10293-4

Mobile Plant (Water Cart) SWMS 10293-4

Product SKU: 10293
Mobile Plant (Water Cart) SWMS 10293-4 Video

Other Details

PDF Download:
mobile_plant_water_cart_swms_10293-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Mobile Plant (Water Cart) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with driving and operating a diesel or petrol fuelled Water Truck, including delivery of water and spraying of water on ground surfaces. Water trucks have a spray boom fitted to the rear of the truck to spray water for the purpose of dust suppression. A Water Truck prestart checklist is provided with this SWMS.

Job Steps Covered in Mobile Plant (Water Cart) SWMS:

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Water cart operation
  4. Obtaining Water from Hydrant or other water source e.g. creek/dam
  5. Arrival at site
  6. Spraying water
  7. Water Pump
  8. Unloading/emptying water cart
  9. Refuelling
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. SWMS for Water Truck

    Posted by on

    This document was very user-friendly. It had all the appropriate information and made it much easier for me to complete the required documentation.


$79.95

PLUS GST

View Cart


You May Also Need...