Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Paving SWMS 10186-6

Paving SWMS 10186-6

Product SKU: 10186
Paving SWMS 10186-6 Video

Other Details

PDF Download:
Paving SWMS 10186-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Logo can easily be added
  • Add or Delete information to this template
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Paving Safe Work Method Statement

This pre-filled Paving Safe Work Method Statement (SWMS) covers general aspects associated with the preparation and laying of pavers. This includes preparing sub grade, manual handling, exposure to Respirable Crystalline Silica (RCS) dust, working adjacent to mobile plant and the safe use of associated machinery.

Job Steps Covered in Paving SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival at site
  4. General Work area set up
  5. Delivery of materials and mobile plant
  6. Setting out/profiling building lines
  7. Preparing subgrade
  8. Laying Pavers
  9. Filling gaps & bedding edge pavers with cement mix
  10. Sand & bedding pavers
  11. Acid washing
  12. Refuelling small engine equipment on site (vibrator plates etc.)
  13. On completion 

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...