Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pest Control (Feral Animal Shooting) SWMS 10620-1

Pest Control (Feral Animal Shooting) SWMS 10620-1

Product SKU: 10620
Pest Control (Feral Animal Shooting) SWMS 10620-1 Video

Other Details

PDF Download:
Pest Control (feral animal shooting) SWMS 10620-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Pest Control (Feral Animal Shooting) Safe Work Method Statement

This Safe Work Method Statement (SWMS) covers the general hazards for shooting feral animals. Included in this SWMS is planning and preparation, training, transporting firearms & ammunition, firearm safety and post shot animal control. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Pest Control (Feral Animal Shooting) SWMS Content: 

  • High Risk Construction Work
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Equipment pre-start safety check
    • Transporting firearms & ammunition
    • Arrival onsite 
    • Setup animal dispatch zone and conduct equipment pre-start check
    • Conduct humane kill
    • Management of the animal post shot/kill
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...