Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pest Control (New - Existing Premises) SWMS 10265-5

Pest Control (New - Existing Premises) SWMS 10265-5

Product SKU: 10265
Pest Control (New - Existing Premises) SWMS 10265-5 Video

Other Details

PDF Download:
Pest Control (new-existing premises) SWMS 10265-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pest Control - New & Existing Premises Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers termite, cockroach and ant eradication using liquid, gel and dust insecticides (containing hazardous chemicals such as fipronil and formaldehyde) in established premises and soil treatments for new structures. 

Job Steps Covered in Pest Control - New & Existing Premises SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, from & between sites
  4. Assess onsite conditions
  5. Prepare intended work site
  6. Pesticide application
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...