Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pipework (Mechanical) SWMS 10451-1

Pipework (Mechanical) SWMS 10451-1

Product SKU: 10451
Pipework (Mechanical) SWMS 10451-1 Video

Other Details

PDF Download:
Pipework (mechanical) SWMS 10451-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pipework (Mechanical) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers the safe installation and fitting of mechanical pipework and is suitable for fire system installation, condenser water pipe work, chilled water pipe work etc.  This includes commercial, industrial and domestic plumbing works. Included in this SWMS is planning and preparation, training, hot works, working at heights and pipework installation.. 

Job Steps Covered in Pipework (Mechanical) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assess onsite conditions
  4. Unloading/storage of materials
  5. Work area set up
  6. Running pipework
  7. Connecting valve sets & copper pipework, cutting & welding pipe & fittings to pipe
  8. Pipework installation via crane lift
  9. Commission system
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...