Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pit Construction SWMS 10595-2

Pit Construction SWMS 10595-2

Product SKU: 10595
Pit Construction SWMS 10595-2 Video

Other Details

PDF Download:
pit_construction_swms_10595-2__30753_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Pit Construction Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the construction of a concrete pit. This includes steel fixing, placing and stripping formwork and the placement of concrete. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Pit Construction SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Working at depths greater than 1.5metres including tunnels or mines
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • General Work area set up
    • Delivery of materials (steel reinforcement formwork etc)
    • Excavating foundations
    • Concrete base
    • Setting steel reinforcement – concrete base & walls
    • Formwork - insitu construction
    • Formwork - prefabricated placement by mobile plant
    • Applying Bond Breakers (if applicable)
    • Pouring concrete – base & walls
    • Removing / stripping formwork
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...