Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Pit Construction SWMS 10595-3

Pit Construction SWMS 10595-3

Product SKU: 10595
Pit Construction SWMS 10595-3 Video

Other Details

PDF Download:
Pit Construction SWMS 10595-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pit Construction Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the construction of a concrete pit. This includes steel fixing, placing and stripping formwork and the placement of concrete.  

Job Steps Covered in Pit Construction SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at Site
  4. General Work Area Set Up
  5. Delivery of Materials (steel reinforcement formwork etc)
  6. Excavating Foundations
  7. Concrete Base
  8. Setting Steel Reinforcement – Concrete base & walls
  9. Formwork - Insitu-construction
  10. Formwork - Prefabricated placement by mobile plant
  11. Applying Bond Breakers (if applicable)
  12. Pouring Concrete – Base & walls
  13. Removing/Stripping Formwork
  14. On Completion

Click here to view a sample of the Pit Construction SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...