Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Plumbing Drain Inspection (CCTV) SWMS 10622-1

Plumbing Drain Inspection (CCTV) SWMS 10622-1

Product SKU: 10622
Plumbing Drain Inspection (CCTV) SWMS 10622-1 Video

Other Details

PDF Download:
Drain Inspection (CCTV) SWMS 10622-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Drain Inspection (CCTV) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the process of inspecting drains. Included in this SWMS is planning and preparation, training, working near traffic, public and powered mobile plant.

Job Steps Covered in Drain Inspection (CCTV) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite/site set-up
  4. Inspect & clearing drain 
  5. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...