Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Plumbing (Pump - Valve) Installation SWMS 10361-4

Plumbing (Pump - Valve) Installation SWMS 10361-4

Product SKU: 10361
Plumbing (Pump - Valve) Installation SWMS 10361-4 Video

Other Details

PDF Download:
plumbing_pump-valve_installation_SWMS_10361-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing Pump - Valve Installation Safe Work Method Statement Scope:

This SWMS covers the removal and installation of industrial pumps and valves. Covered in this SWMS is the loading/unloading of materials and equipment, work area set up, manual handling, lifting by crane or machinery, and testing of new installations. This SWMS is also suitable for the installation of fire servicebooster assemblies and hydrants.

Job Steps Covered in Plumbing Pump - Valve Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Assess Onsite Conditions
  4. Delivery of Materials (pumps, valves etc.)
  5. Work Area Setup
  6. Disconnecting an Existing Pump/Motor/Valve
  7. Lifting Pumps - Motors - Valves into/out of position
  8. Gasket Removal / Flange Cleaning
  9. Replace/Fit New Pump/Motor
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...