Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Sewage - Drainage) SWMS 10381-4

Plumbing (Sewage - Drainage) SWMS 10381-4

Product SKU: 10381
Plumbing (Sewage - Drainage) SWMS 10381-4 Video

Other Details

PDF Download:
Plumbing (sewage - drainage) SWMS 10381-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing - Sewage - Drainage Safe Work Method Statement

This SWMS provides guidance on construction of residential and commercial ground level sewerage and drainage. This includes the planning, preparation, operation and emergency procedures involved with installing new drainage and sewerage from ground floor height to an existing sewer line. This SWMS includes working in excavations greater than 1.5m deep. 

This SWMS does not include the installation of any internal piping or fixtures beyond the subfloor level. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Plumbing - Sewage - Drainage SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Working at depths greater than 1.5m, including tunnels or mines
    • Work carried our adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    1. Planning & Preparation
    2. Training and Capabilities
    3. Arrival onsite
    4. Set up work area
    5. Delivery of materials (pipes, backfill material)
    6. Excavating & backfilling
    7. Installing & removing trench shields/shoring
    8. Working in Trenches > 1.5m
    9. Lifting pipes into excavations
    10. Fixing pipework
    11. On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...