Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Sewage - Drainage) SWMS 10381-5

Plumbing (Sewage - Drainage) SWMS 10381-5

Product SKU: 10381
Plumbing (Sewage - Drainage) SWMS 10381-5 Video

Other Details

PDF Download:
Plumbing (sewage - drainage) SWMS 10381-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing (Sewage - Drainage) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) provides guidance on construction of residential and commercial ground level sewage and drainage. This includes the planning, preparation, operation and emergency procedures involved with installing new drainage and sewage from ground floor height to an existing sewer line. This SWMS includes working in excavations greater than 1.5m deep. This SWMS does not include the installation of any internal piping or fixtures beyond the subfloor level.


Job Steps Covered in Plumbing (Sewage - Drainage) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Set up work area
  5. Delivery of materials (pipes, backfill material)
  6. Excavating & backfilling
  7. Installing & removing trench shields /shoring
  8. Working in Trenches >1.5m deep
  9. Lifting Pipes into excavations
  10. Fixing pipework
  11. On Completion
  12. Record Keeping/ Health Monitoring

Click here to view a sample of the Plumbing (sewage - drainage) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...