Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (stormwater - drainage) SWMS 10384-3

Plumbing (stormwater - drainage) SWMS 10384-3

Product SKU: 10384
Plumbing (stormwater - drainage) SWMS 10384-3 Video

Other Details

PDF Download:
Plumbing_StormwaterDrainage_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing - Stormwater Drainage Safe Work Method Statement

This Safe Work Method Statement (SWMS) outlines the general safety steps, hazards and controls associated with the general installation of a PVC storm water drainage system from a building structure to a roadside gutter discharge area or easement. This SWMS includes excavation, working adjacent to machinery, loading and unloading materials and installation of PVC pipework.

This SWMS does not cover civil road allotment drainage or sub-division drainage systems.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Plumbing - Stormwater Drainage SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Set up work area
    • Temporary Traffic Control (TMP)
    • Delivery of materials and equipment
    • Excavating & backfilling - Working with Machinery
    • Working in trenches
    • Fixing pipework
    • Working with cement E.g. rapid set concrete
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...