Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Suspended Pipe) Installation SWMS 10198-4

Plumbing (Suspended Pipe) Installation SWMS 10198-4

Product SKU: 10198
Plumbing (Suspended Pipe) Installation SWMS 10198-4 Video

Other Details

PDF Download:
Plumbing (suspended pipe installation) 10198-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing (Suspended Pipe) Installation Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with installation of suspended pipework from Elevating Work Platforms. This includes safe operation of Elevated Work Platforms including scissor lifts, boom lifts and cherry pickers and the use of ladders and trestles.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Plumbing (Suspended Pipe) Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant 
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers 
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    1. Planning & Preparation
    2. Training and Capabilities
    3. Loading / unloading materials/ equipment
    4. Delivery and removal of EWP
    5. Arrival & set-up onsite 
    6. EWP - Pre-start check
    7. EWP Operation
    8. Installing pipework
    9. Refuelling EWP on site
    10. On Completion
  • Falls Emergency Rescue Plan
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...