Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Plumbing (Suspended Pipe) Installation SWMS 10198-5

Plumbing (Suspended Pipe) Installation SWMS 10198-5

Product SKU: 10198
Plumbing (Suspended Pipe) Installation SWMS 10198-5 Video

Other Details

PDF Download:
Plumbing (suspended pipe installation) 10198-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Logo can easily be added
  • Add or Delete information to this template
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing (Suspended Pipe Installation) Safe Work Method Statement

This pre-filled Plumbing (suspended pipe installation) Safe Work Method Statement (SWMS) covers risks associated with installation of suspended pipework from Elevating Work Platforms. This includes safe operation of Elevated Work Platforms including scissor lifts, boom lifts and cherry pickers and the use of ladders and trestles.  Incldues Falls Emergency Rescue Plan.

Job Steps covered in Plumbing (Suspended Pipe Installation) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Loading/unloading materials/equipment
  4. Delivery and removal of EWP
  5. Arrival & set up onsite
  6. EWP - Pre-start check
  7. Installing pipework
  8. Refuelling EWP on site
  9. On completion 
  10. Record Keeping/ Health Monitoring

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...