Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Temporary Services Connection) SWMS 10396-2

Plumbing (Temporary Services Connection) SWMS 10396-2

Product SKU: 10396
Plumbing (Temporary Services Connection) SWMS 10396-2 Video

Other Details

PDF Download:
Plumbing (temporary services connection) SWMS 10396-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
  • Fully customisable so you can add your logo and any site specific details
  • Complies with current legislation in all States and Territories
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing Temporary Services Connection Safe Work Method Statement

This Safe Work Method Statement (SWMS) provides an outlines of the job steps, generic hazard and controls associated with the temporary installation of water pipe/sewerage on construction sites. Included in this SWMS is planning & preparation, site safety rules and training, working with machinery, hazardous manual tasks and underground utilities. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Plumbing Temporary Services Connection SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway of shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Arrival at site
    • Work area set up
    • Excavation work - public access
    • Hot work - electric or gas welding, soldering/cutting
    • Running pipe and termination
    • Testing and commissioning
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...