Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Temporary Services Connection) SWMS 10396-3

Plumbing (Temporary Services Connection) SWMS 10396-3

Product SKU: 10396
Plumbing (Temporary Services Connection) SWMS 10396-3 Video

Other Details

PDF Download:
Plumbing (temporary services connection) SWMS 10396-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing (Temporary Services Connection) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers the temporary installation of water pipe/sewerage on construction sites. Included in this SWMS is planning & preparation, site safety rules and training, working with machinery, hazardous manual tasks, underground utilities and exposure to Respirable Crystalline Silica (RCS) dust. 

Job Steps Covered in Plumbing (Temporary Services Connection) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Excavation work- public access
  5. Hot work – electric or gas welding. Soldering/Cutting
  6. Running Pipe and termination
  7. Testing and commissioning
  8. On Completion
  9. Record Keeping/ Health Monitoring

Click here to view a sample of the Plumbing (Temporary Services Connection) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...