Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Plumbing (UPVC - coiled pipes) SWMS 10339-5

Plumbing (UPVC - coiled pipes) SWMS 10339-5

Product SKU: 10339
Plumbing (UPVC - coiled pipes) SWMS 10339-5 Video

Other Details

PDF Download:
plumbing_upvc_-_coiled_pipes_swms_10339-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing (UPVC - Coiled Pipes) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) provides guidance installation of UPVC pipes for civil works. This includes the planning, preparation, delivery and operations when uncoiling and installing pipes into an excavation less than 1.5m.  

Job Steps Covered in Plumbing (UPVC - Coiled Pipes) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Set up work area
  5. Temporary traffic control (TMP)
  6. Delivery of materials (e.g. pipes, backfill material)
  7. Excavating & backfilling - working with machinery
  8. Excavating ground - water charged ground
  9. Pipe placement in excavations
  10. Fixing pipework
  11. Working with cement e.g rapid set concrete or mortar
  12. On Completion

 
godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...