Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Power Tools (Explosive) SWMS 10104-4

Power Tools (Explosive) SWMS 10104-4

Product SKU: 10104
Power Tools (Explosive) SWMS 10104-4 Video

Other Details

PDF Download:
power_tools_explosive_swms_10104-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Power Tools (Explosive) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with operating hand held explosive fastening tools.

The power tools (explosive) SWMS covers the general use of Powder Actuated (PA) hand held tools; PA hand-held tools are used to drive a fastener (such as pin, stud or bolt) through solid building materials (such as concrete, masonry or steel) using explosive force derived from the detonation of a cartridge containing explosives. They are extremely powerful and dangerous tools that can cause serious injuries and death.   

Job Steps Covered in Power Tools (Explosive) SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Work are set up
  5. Pre-start checks
  6. Loading fasteners and cartridges
  7. Alert to others before firing
  8. Fastening
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...