Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with operating hand held power tools and cover the general safety issues concerned with the operation of hand held power tools.
Examples of power tools include: Drills (electric, pneumatic, battery operated etc.), Chainsaws, Portable power tools, Angle grinders, Etc.
(includes potential hazards and control measures)