Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

Powerpole - Removal - Installation SWMS 10

Powerpole - Removal - Installation SWMS 10

Product SKU: 10328
Powerpole - Removal - Installation SWMS 10 Video

Other Details

PDF Download:
Powerpole_Removal_installation_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Powerpole - Removal - Installation Safe Work Method Statement

This SWMS covers general hazards associated with power pole removal and installation using a Lifter/Borer in the presence of overhead power lines and in close proximity to roads with public vehicular traffic. Included in this SWMS is controls for working adjacent to powerlines, traffic control, planning, preparation and safe work with mobile plant.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Powerpole - Removal - Installation SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Site setup
    • Select & Inspect equipment
    • Pre-operational assessment
    • Lifter / Borer Operation
    • Auger use - Excavating post hole
    • Backfill Holes
    • Maintenance on site
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 
  • Lifter / Borer Pre Start Checklist - Road Travel

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...