Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Powerpole (Removal - Installation) SWMS 10328-4

Powerpole (Removal - Installation) SWMS 10328-4

Product SKU: 10328
Powerpole (Removal - Installation) SWMS 10328-4 Video

Other Details

PDF Download:
powerpole_removal-installation_swms_10328-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Powerpole - Removal - Installation Safe Work Method Statement Scope:

This SWMS covers general hazards associated with power pole removal and installation using a Lifter/Borer in the presence of overhead power lines and in close proximity to roads with public vehicular traffic. Included in this SWMS is controls for working adjacent to powerlines, traffic control, planning, preparation and safe work with mobile plant. Lifter/Borer Prestart Checklist included.

Job Steps Covered in Powerpole - Removal - Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Site Setup
  5. Select & Inspect Equipment
  6. Pre-operational Assessment
  7. Lifter/Borer Operation
  8. Auger Use - Excavating Post Hole
  9. Backfill Holes
  10. Maintenance Onsite
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...