Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the preparation, planning and conduct of work in a rail corridor. This document is intended for use as an attachment, to be used in addition to the relevant SWMS for the specific work being conducted in a rail corridor.
(includes potential hazards and control measures)