Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Rail Corridor - Vegetation Control SWMS 10

Product SKU: 10569
Rail Corridor - Vegetation Control SWMS 10 Video

Other Details

PDF Download:
RailCorridor_Vegetation_Control_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Rail Corridor - Vegetation Control Safe Work Method Statement

This Safe Work Method Statement (SWMS) outlines the general safety steps, hazards and controls associated with vegetation control, using brush cutters, in rail corridors.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Rail Corridor - Vegetation Control SWMS Content: 

  • High Risk Construction Work
    • Work carried our adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Travel to, from & between sites
    • Assess onsite conditions
    • Prepare intended worksite
    • Brush cutting
      • Potential hazards covered:
        • cuts, lacerations & abrasions
        • public and other worker safety
        • slips, trips and falls
        • contact with reptiles, spiders and insects
        • contact with hazardous plants
        • fire
        • hazardous manual tasks
        • entanglement
    • Refuelling on site
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...