Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Refrigeration SWMS 10366-4

Refrigeration SWMS 10366-4

Product SKU: 10366
Refrigeration SWMS 10366-4 Video

Other Details

PDF Download:
Refrigeration_SWMS_10366-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Refrigeration Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation and maintenance of self-contained, low charged refrigerant systems. 

This SWMS does not cover maintenance of high-pressure systems or use of anhydrous ammonia refrigerant in bulk.

Job Steps Covered in Refrigeration SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Cylinder Transport
  4. Assess Onsite Conditions
  5. Work Area Set-up
  6. Pre-operation Inspection
  7. General Operation
  8. Commission Equipment
  9. Handling & Storing Refrigerants
  10. Height Access
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...