Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Remote and Isolated Areas - Work in SWMS 10

Remote and Isolated Areas - Work in SWMS 10

Product SKU: 10336
Remote and Isolated Areas - Work in SWMS 10 Video

Other Details

PDF Download:
Remote_Isolated_Work_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • This SWMS also includes a Remote / isolated Work Plan, Communication Log, Call-In Log and Departure Checklist
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Delivered via email for instant download
  • You must have Microsoft Word to use this template (SWMS Template for use with iAuditor coming soon)

Remote and / or Isolated Work Safe Work Method Statement

This SWMS is for use by relevant workers engaged in work activities in Isolation or Remote areas, or who work alone in a workplace. Tasks carried out at a remote worksite, or general workplace shall require a SWMS specific to that work.

  • Remote Locations: Locations that are, outside the metropolitan area and not in close proximity to emergency or support services.
  • Remote Worker: Relevant worker(s)/employee(s) undertaking work at remote locations.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

 

Remote and / or Isolated Work SWMS Content: 

  • SWMS Scope
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Conduct Risk Assessment
    • Assess onsite conditions
    • Remote / isolated work including Emergency Response Procedures
  • Remote / Isolated Work Plan
  • Communication Log
  • Call-In Log
  • Departure Checklist
  • Area to include Additional Protocols
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...