Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Retaining Wall (Post - Sleeper) SWMS 10558-3

Retaining Wall (Post - Sleeper) SWMS 10558-3

Product SKU: 10558
Retaining Wall (Post - Sleeper) SWMS 10558-3 Video

Other Details

PDF Download:
Retaining Wall (post - sleeper) SWMS 10558-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Retaining Wall (Post - Sleeper) Safe Work Method Statement Scope:

This SWMS covers the general hazards relating to the construction of post and sleeper type retaining walls for landscaping projects. This includes the use of concrete or timber sleepers. Covered in this SWMS is planning, working with machinery, public safety and hazardous manual handling and exposure to Respirable Crystalline Silica (RCS) dust.

Job Steps Covered in Retaining Wall (Post - Sleeper) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Assess Onsite Conditions
  4. Set up Work Area
  5. Delivery of Materials (sleepers, posts, backfill material)
  6. Excavation for Retaining Wall
  7. Post Holes
  8. Setting Posts
  9. Placing Sleepers
  10. Placement of Geotextile Fabric
  11. Backfilling
  12. On Completion

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...