Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Roadworks (Rock - Pavement Laying) SWMS 10443-1

Roadworks (Rock - Pavement Laying) SWMS 10443-1

Product SKU: 10443
Roadworks (Rock - Pavement Laying) SWMS 10443-1 Video

Other Details

PDF Download:
Roadworks (rock-pavement laying) SWMS 10443-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Roadworks (Rock - Pavement Laying) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with roadbase installation. This includes planning and preparation, environmental controls, working adjacent to mobile plant, training and communications and operational controls.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Roadworks (Rock - Pavement Laying) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant 
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    1. Planning & Preparation
    2. Training and Capabilities
    3. Arrival at Site
    4. Setup Work Area
    5. Stripping Topsoil
    6. Sub-grade Layer – refer to engineer design
    7. Compact Layers
    8. Sub-base & Base Layer
    9. Sealing
    10. Travel to & Unloading Spoil at Landfill
    11. On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...