Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Roadworks (Stabilising Road Pavement) SWMS 10460-2

Roadworks (Stabilising Road Pavement) SWMS 10460-2

Product SKU: 10460
Roadworks (Stabilising Road Pavement) SWMS 10460-2 Video

Other Details

PDF Download:
Road Works (stabilising road pavement) SWMS 10460-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Roadworks (Stabilising Road Pavement) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with stabilising road pavement. This SWMS covers the planning and preparation of the activity, traffic management , working adjacent to mobile plant, silica dust control and other general controls associated with the task.

Job Steps Covered in Roadworks (Stabilising Road Pavement) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at Site
  4. Setup Work Area
  5. Spread cement / lime
  6. Mulch patch
  7. Roll patch
  8. Grade patch (Higher than level and cut to level)
  9. Aftercare signage
  10. On Completion

Click here to view a sample of the Road Works (Stabilising Road Pavement) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...