Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Roof - Subfloor Space (working in) SWMS 105334-2

Roof - Subfloor Space (working in) SWMS 105334-2

Product SKU: 10534
Roof - Subfloor Space (working in) SWMS 105334-2 Video

Other Details

PDF Download:
Roof_Subfloor_Space_workingin_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word and iAuditor to use this template

Roof - Subfloor Space (working in) Safe Work Method Statement

This SWMS covers the control of hazards related to working in ceiling spaces and sub floors. For the purposes of this SWMS these spaces will be referred to as ‘enclosed spaces’. For any work using height access equipment (e.g. EWP, scaffolding etc.) to access a ceiling space, ensure a dedicated SWMS relating to this equipment is also in place.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Roof - Subfloor Space (working in) SWMS Content: 

  • Hazardous Work
    • Mobile Plant   
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Conduct Risk Assessment
    • Isolated work
    • Work area set up
    • Entering ceiling space
    • Working in ceiling space / under floor
    • Confined spaces
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...