Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Roof - Subfloor Space (Working In) SWMS 10534-2

Roof - Subfloor Space (Working In) SWMS 10534-2

Product SKU: 10534
Roof - Subfloor Space (Working In) SWMS 10534-2 Video

Other Details

PDF Download:
roof_-_subfloor_space_working_in_swms_10534-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Roof - Subfloor Space (Working In) Safe Work Method Statement Scope:

This SWMS covers the control of hazards related to working in ceiling spaces and sub floors. For the purposes of this SWMS these spaces will be referred to as ‘enclosed spaces’.

For any work using height access equipment (e.g. EWP, scaffolding etc.) to access a ceiling space, ensure a dedicated SWMS relating to this equipment is also in place.

Job Steps Covered in Roof - Subfloor Space (Working Iin) SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Isolated work
  5. Work area set up
  6. Entering ceiling space
  7. Working in ceiling space / under floor
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...