Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Security Guard (Static Guard - Patrol) SWMS 10627-1

Security Guard (Static Guard - Patrol) SWMS 10627-1

Product SKU: 10627
Security Guard (Static Guard - Patrol) SWMS 10627-1 Video

Other Details

PDF Download:
Security Guard (static guard-patrol) SWMS 10627-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Security Guard (Static Guard - Patrol) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with security static / patrol guard activities at sites where the general public are present such as shopping centres. This SWMS includes a Incident/Injury Report Form.

Job Steps Covered in Security Guard (Static Guard - Patrol) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Guarding public areas e.g. shopping centres etc., and loading areas e.g. goods delivery areas etc.
  4. Observation by CCTV
  5. Patrol at/between sites
  6. End of shift


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...