Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Shop Strip-Out SWMS 10

Shop Strip-Out SWMS 10

Product SKU: 10367
Shop Strip-Out SWMS 10 Video

Other Details

PDF Download:
Strip-out_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Aligns with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Shop Strip-Out Safe Work Method Statement

The Shop Strip-Out Safe Work Method Statement (SWMS) is a pre-filled document that provides guidance on the risk management processes and procedures that need to be followed when preparing to perform demolition works or strip-outs of existing commercial premises in preparation for a new fit-out. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Shop Strip-Out SWMS Content: 

  • High Risk Construction Work
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Remove items (furnishing, cabinets, rugs, appliances, partitions etc)
    • Carpet / vinyl removal
    • Glass / Window Removal
    • Removal ceiling fittings, ceiling panels, non structural walls, timbers etc
    • Tile, concrete flooring removal
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

 

swmsformats.png

                                                                                                                                                  app-store-badge.png google-play-badge.png

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...