Shotcrete Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Shotcrete Safe Work Method Statement
This Shotcrete Safe Work Method Statement (SWMS) covers hazards and controls associated with the application of shotcrete.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Shotcrete SWMS:
(includes potential hazards & control measures)
- Provide Training on the Health Effects Associated with RCS
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Working Near Powered Mobile Plant During:
- Delivering Materials
- Concrete Delivery
- Working with Powered & Non-powered Tools
- Working at Height
- Working Around Steel Reinforcement
- Working Adjacent to Formwork
- Pump Placement
- Shooting Concrete
- On Completion
- Emergency Response
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Shotcrete Safe Work Method Statement
This Shotcrete Safe Work Method Statement (SWMS) covers hazards and controls associated with the application of shotcrete.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Shotcrete SWMS:
(includes potential hazards & control measures)
- Provide Training on the Health Effects Associated with RCS
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Housekeeping
- Manual Tasks
- Working Near Powered Mobile Plant During:
- Delivering Materials
- Concrete Delivery
- Working with Powered & Non-powered Tools
- Working at Height
- Working Around Steel Reinforcement
- Working Adjacent to Formwork
- Pump Placement
- Shooting Concrete
- On Completion
- Emergency Response